Last Updated: November 22, 2026
Quick Summary
To meet NCC passive fire protection requirements, confirm the applicable NCC edition and jurisdictional variations, then review the design against Section C and match fire-resistance levels to building class, height, size and construction type. Every fire-rated element and penetration must be backed by a tested system whose report covers the exact installed configuration, with inspection records and photographs compiled as handover evidence for the certifier.
- Section C Performance Requirements can be met via the Deemed-to-Satisfy path or a Performance Solution.
- Check which NCC edition your state or territory has adopted before reviewing any design.
- One unsealed service penetration undoes a fire-rated wall, so coordinate trades and assign responsibility in writing.
- Photograph and record each installation against the tested system before it is concealed.
- Engage a fire engineer during concept design, before the passive fire protection strategy is locked in.
Table of Contents
- What the NCC Requires for Passive Fire Protection
- Step-by-Step Workflow for Passive Fire Protection Compliance
- Matching Fire-Resistance Levels to Building Class and Construction
- Fire Stopping Requirements for Service Penetrations
- When a NCC Performance Solution Fire Engineering Report Is Needed
- Your Passive Fire Protection Compliance Checklist
- Passive Fire Protection Inspection and Documentation
- Engaging a Fire Engineer for Your Project
- Frequently Asked Questions
What the NCC Requires for Passive Fire Protection
Passive fire protection is the built-in system of fire-rated walls, floors, doors and seals that slows fire and smoke without needing sprinklers or alarms to activate. In Australia, the National Construction Code sets the rules, and meeting those rules starts with knowing which pathway your project will follow.
The NCC does not ask for “fire safety” in general terms. It asks you to prove that specific elements resist fire for a set period, and that the proof is documented. This guide breaks down how to meet NCC passive fire protection requirements from design review through to handover, including the checks certifiers typically look for.
Passive fire protection compliance is not a single inspection. It is a chain of evidence that begins at design and ends at handover.
Section C, Performance Requirements and the Deemed-to-Satisfy Path
Section C of the NCC sets the Performance Requirements for fire resistance, and there are two ways to satisfy them. The Deemed-to-Satisfy path applies prescriptive provisions such as fire-resisting construction and fire compartments. The alternative is a Performance Solution, which proves compliance by other means.
The NCC 2019 Amendment 1 Section C provisions show how verification methods such as CV4 can demonstrate that a building meets Performance Requirements CP1 to CP9. That matters for projects where the prescriptive route does not fit the design.
For complex designs, the choice between pathways is less obvious. Our guide on Performance Solution vs Deemed-to-Satisfy compares the two pathways so you can pick before design locks in.
Step-by-Step Workflow for Passive Fire Protection Compliance
Passive fire protection compliance works best as a staged workflow, not a last-minute audit.
What you’ll need:
- The NCC edition and any state or territory amendments that apply to the project
- Architectural and services drawings, including penetration layouts
- A fire-resisting element schedule keyed to building class and FRL
- Test evidence for every specified system, including the report number and the tested configuration
Step 2: Review the design against Section C. Identify every fire-resisting element, fire compartment and penetration before work starts.
Step 3: Confirm FRLs and construction type. Match each element to the required fire resistance level for its building class, height, size and construction type.
Step 5: Coordinate trades and assign responsibility. Penetrations, fire doors and seals cross multiple trades. One unsealed service penetration undoes a fire-rated wall.
Step 6: Inspect and document before concealment. Photograph and record each installation against the tested system before it is closed up.
Step 7: Compile handover evidence. Assemble reports, certificates, inspection records and photographs into a single register the certifier can audit.
Builders who want a stage-by-stage record can use this NCC fire safety checklist for builders to track fire doors, fire-rated walls and penetrations at each phase.
Matching Fire-Resistance Levels to Building Class and Construction
Fire resistance level is the measure of how long a building element resists fire under test, expressed in minutes for structural adequacy, integrity and insulation. The required FRL depends on building class, height, size and construction type.
A Class 2 apartment building and a Class 5 office block can sit on the same street and carry different requirements. Building class drives the fire-resisting construction provisions, and those provisions set the FRL for each element.
Getting this wrong can cause the passive fire protection strategy to fail at assessment.
| Building element | What determines its FRL | Evidence needed |
|---|---|---|
| External walls | Building class, height, proximity to boundary | Tested wall system report |
| Internal fire walls | Fire compartment layout | Tested system plus installation record |
| Floors and ceilings | Class and construction type | Tested floor/ceiling system report |
| Fire doors | Compartment boundaries | Door set certification and tagging |
| Service penetrations | Element being penetrated | Sealing system test evidence |
A common mistake is choosing a system that meets the FRL on paper but is installed in a condition the test did not cover.
Fire Stopping Requirements for Service Penetrations
Fire stopping is the sealing of openings where pipes, cables and ducts pass through fire-resisting elements, and it is where most passive fire protection failures occur. A fire-rated wall with an unsealed penetration is no longer fire-rated at that point.
Every service penetration needs a tested sealing system matched to the pipe or cable type, the wall or floor construction, and the size of the opening.

A common non-compliance is a sealant applied to a penetration without matching test evidence for that exact configuration, which a certifier would be likely to reject.
Three checks matter most:
- Does the sealing system’s test report cover this pipe material and diameter?
- Does it cover this wall or floor type and thickness?
- Was the installation done exactly as the tested system specifies?
If any answer is no, the penetration needs remediation before handover.
When a NCC Performance Solution Fire Engineering Report Is Needed
A Performance Solution fire engineering report is needed when a design cannot meet the Deemed-to-Satisfy provisions, or when meeting them would be impractical or overly costly. The report proves the alternative design still achieves the Performance Requirements.
The NCC 2025 Australian fire engineering guidelines set out how a Performance Solution must demonstrate compliance, and note that passive fire protection elements can be compromised during building modifications.
Before commissioning one, it helps to understand what a fire engineering Performance Solution is and what a fire engineering report should include. A report that omits evacuation modelling or fire spread analysis may be returned for further information.
At FyreWise, we ensure all non-compliances are identified at the start of the project. We sometimes liaise with the architect, builder and certifier to address every issue in our solutions.
Your Passive Fire Protection Compliance Checklist
A passive fire protection compliance checklist keeps the evidence trail intact from design to handover. Use it at each stage and keep the records together, because the certifier will ask for them as a set rather than individually.
Design and specification
- Confirm the applicable NCC edition and any state or territory amendments for the project
- Identify every fire-resisting element and fire compartment on the drawings
- Match FRLs to building class, height, size and construction type
- Obtain test evidence for every specified system, and confirm the report covers the exact configuration
- Verify NATA-accredited laboratory reports are current and legible
- Record any Performance Solution and the fire engineering report that supports it
Construction and installation
- Inspect penetration sealing before concealment, with photographs keyed to the drawing location
- Tag and record every fire door, including the door set certification and any hardware schedule
- Photograph installations against the tested system, including the product label and the surrounding substrate
- Record any deviation from the tested condition and how it was resolved
- Confirm modifications have not compromised existing protection in the compartment
Handover and documentation
- Compile a register of tested system references and report numbers
- Attach installation records with dates and the tradesperson responsible
- Include before-concealment photographs for every penetration and fire door
- Provide the fire engineering report and any Performance Solution documentation
- Confirm the register is indexed to the fire-resisting element schedule so the certifier can trace each item
Common non-compliance examples to check for
- Unsealed or partially sealed service penetrations through fire-rated walls and floors
- Sealant or collars installed in a configuration the test report never covered
- Fire doors with incorrect hardware, missing tags or altered gaps
- Substituted products on site without matching test evidence
- Undocumented alterations that breach an existing fire compartment
Where any of these are found, remediation should be recorded against the original element, not treated as a new installation. The documentation stage is where projects stall: missing evidence at handover means the certifier cannot sign off, and remediation after the fact costs far more than getting it right during construction.
Passive Fire Protection Inspection and Documentation
Inspection and documentation turn installed passive fire protection into provable compliance. An installation that cannot be evidenced is treated as non-compliant, however well it was built.
Industry expectations are shifting here. A 2026 passive fire protection industry review reports that clients now expect stronger performance data and better traceability. Documentation is no longer an afterthought.
What to record for each element:
- The tested system reference and report number
- Installation date and the tradesperson responsible
- Photographs before concealment
- Any deviation from the tested condition, and how it was resolved
FyreWise offers fast turnaround, typically within 2-3 days, and reports are quickly accepted by certifiers.
Engaging a Fire Engineer for Your Project
Engaging a fire engineer early is the single most reliable way to avoid late-stage redesign. The right time is during concept design, before the passive fire protection strategy is locked in.
A phone call can show how knowledgeable a fire safety provider is. Ask how confident they are in handling your specific fire safety issue. At FyreWise, clients often cannot explain their issue because it is not generally understandable to a layperson.
What to check before you engage anyone:
- Are the engineers chartered and RPEQ accredited?
- Can they show reports accepted by certifiers on similar projects?
- Do they work with your architect, builder and certifier to resolve issues?
- Will they identify non-compliances at the start, not at handover?
FyreWise offers bespoke, performance-based solutions at competitive prices, with fast turnaround and a focus on the most cost-effective, practical option for your project. You can get in touch with our fire engineering team to discuss your project.
Meeting NCC passive fire protection requirements comes down to evidence: the right tested systems, installed as tested, documented at every stage. Get that chain right and certification stops being a gamble.
Frequently Asked Questions
What does the NCC require for passive fire protection?
The NCC sets Performance Requirements for fire resistance, fire hazard properties and limiting fire spread, and a building must satisfy them through a Deemed-to-Satisfy solution or a Performance Solution. Section C of the NCC sets out the fire-resistance provisions and the verification methods used to demonstrate compliance with the Performance Requirements. In practice, that means fire-resisting elements, fire compartments and penetration seals must be specified, installed and evidenced to a tested system.
What is the difference between a Deemed-to-Satisfy solution and a Performance Solution?
A Deemed-to-Satisfy solution follows the prescriptive NCC provisions, such as the fire-resistance tables for each building class. A Performance Solution, which may use NCC Performance Solution fire engineering, is assessed against the Performance Requirements instead, so it can support designs that fall outside the prescriptive rules. A Performance Solution needs documented evidence, often including a fire engineering report reviewed by the certifier, and it should be agreed early in design rather than after construction drawings are complete.
What should a passive fire protection compliance checklist cover?
A passive fire protection compliance checklist should list every fire-resisting element and its required fire resistance level, the tested systems specified for each, and the evidence held for them. Add sign-off points for penetration sealing, fire doors, fire collars and fire-rated construction joints, plus a register of NATA-accredited laboratory reports. Include inspection hold points during construction and a handover pack with as-installed records, so the certifier can trace each element back to test evidence.
How should fire-stopping systems be inspected and recorded?
Fire-stopping should be inspected before linings close up, so seals can be checked against the tested system rather than assumed. Record each penetration with a photograph, its location, the product used and the installer, and keep the manufacturer’s test evidence on file. Passive fire protection can be affected by building modifications, so scheduling re-inspection after any refurbishment and keeping the register current is good practice.